MSC VENICE (IMO 9647473) is a Liberia-flagged container ship. As of Nov 12, 2026, 02:40 UTC: last reported under way from Long Beach to Tianjin; reported ETA Nov 27, 04:00 port local time. Position last updated Nov 10, 15:49 UTC.
Vessel Details
Vessel type
Container Ship
Detailed type
Container Ship
Flag
LR
Year built
2016
TEU capacity
15,908 TEU
Max draught
13.7 m
Gross tonnage
176,490 GT
Deadweight tonnage
186,650 DWT
Average speed
7.2 kn
Maximum speed
96 kn
Call sign
D5KU2
Home port
MONROVIA
AIS Position
As of Nov 12, 2026, 14:47 UTC.
Last reported at 24.9°N, 120.6°W.
Position last updated Nov 10, 2026, 15:49 UTC.
Last reported navigation status: Under way using engine. MMSI 636017408.
Voyage LONG BEACH (USLGB) to TIANJIN (CNTNJ), reported ETA Nov 27, 2026, 04:00 port local time.
A note from Julia at Skypace
Do you ship between the US and China or Vietnam? Let's meet: I'd be glad to see how Skypace can help on your lanes. My next opening is Friday, Nov 13 at 10:00 AM PT. Book it or pick another time here.
Port Call History
As of Nov 12, 2026, 14:47 UTC.
port local time
Long Beach (USLGB), United States: departed Nov 8, 2026, 20:08.
Los Angeles (USLAX), United States: moored Oct 29, 2026, 11:10, departure not observed.
Long Beach (USLGB), United States: arrived at anchorage Oct 29, 2026, 06:14, departed Oct 29, 2026, 09:14; last live ETA was Oct 29, 2026, 05:30.
Xiamen (CNXAM), CN: arrived at anchorage Oct 12, 2026, 14:23, moored Oct 12, 2026, 15:53, departed Oct 13, 2026, 19:44; last live ETA was Oct 12, 2026, 13:00; arrived 2 hours 54 minutes later than expected. Time at anchorage: 59 minutes Time at terminal: 1 day 2 hours Time in port: 1 day 5 hours
Cai Mep International Terminal (VNTOT), VN: arrived at anchorage Oct 5, 2026, 07:27, moored Oct 5, 2026, 08:58, departed Oct 7, 2026, 12:50. Time at anchorage: 56 minutes Time at terminal: 2 days 1 hour Time in port: 2 days 5 hours
Laem Chabang (THLCH), TH: arrived at anchorage Sep 29, 2026, 17:36, moored Sep 29, 2026, 19:36, departed Oct 2, 2026, 20:55; last live ETA was Sep 29, 2026, 17:00; arrived 2 hours 36 minutes later than expected. Time at terminal: 2 days 23 hours Time in port: 3 days 2 hours