JAZAN (IMO 9349540) is a Liberia-flagged container ship. As of Sep 25, 2026, 19:48 UTC: under way from Suape to Santos; reported ETA Sep 26, 10:00 port local time.
Vessel Details
Vessel type
Container Ship
Detailed type
Container Ship
Flag
LR
AIS Position
As of Sep 25, 2026, 19:48 UTC.
Last reported at 24.1°S, 45.1°W.
Position last updated Sep 25, 2026, 08:18 UTC.
Last reported navigation status: Under way using engine. MMSI 636093139.
Voyage SUAPE (BRSUA) to SANTOS (BRSSZ), reported ETA Sep 26, 2026, 10:00 port local time.
A note from Julia at Skypace
Do you ship between the US and Argentina or Colombia? Let's meet: I'd be glad to see how Skypace can help on your lanes. My next opening is Monday, Sep 28 at 10:00 AM PT. Book it or pick another time here.
Scheduled Sailings for JAZAN
As of Sep 25, 2026, 19:48 UTC.
port local time
Buenos Aires (ARBUE) to Cartagena (COCTG) · ETD Oct 2, 2026, ETA Oct 24, 2026, 21 days transit · Hapag-Lloyd · Voy. 2634N · Sourcing in-progress
Related Voyages
As of Sep 25, 2026, 19:48 UTC.
port local time
Hapag-Lloyd, Voy. 2634N: Buenos Aires (ARBUE) to Savannah (USSAV) via Cartagena (COCTG). JAZAN sails the Buenos Aires (ARBUE) to Cartagena (COCTG) leg. Departs Oct 2, 2026, arrives Nov 14, 2026. From $4,018 / 40′
New Orleans (USMSY), US: arrived Aug 31, 2026, 03:50 (approximate), departed Sep 1, 2026, 01:13 (approximate). Arrival observed between Aug 30, 2026, 11:47 and Aug 31, 2026, 03:50 (approximate). Departure observed between Aug 31, 2026, 19:46 and Sep 1, 2026, 01:19 (approximate).
Houston (USHOU), US: departed Aug 28, 2026, 07:35.
ALTAMIRA (MXATM), MX: departed Aug 23, 2026, 10:52.
Cartagena (COCTG), CO: arrived at anchorage Aug 14, 2026, 20:14, moored Aug 14, 2026, 22:09, departed Aug 15, 2026, 21:24; last live ETA was Aug 14, 2026, 20:00; arrived 2 hours 10 minutes later than expected. Terminal: Contecar terminal (COCNR)
Santos (BRSSZ), BR: arrived at anchorage Aug 3, 2026, 00:42, moored Aug 3, 2026, 02:24, departed Aug 4, 2026, 04:27. Time at anchorage: 1 hour 30 minutes Time at terminal: 23 hours 43 minutes Time in port: 1 day 3 hours
Itajai (BRITJ), BR: moored Aug 1, 2026, 13:12, departed Aug 2, 2026, 07:14.