HR SARERA (IMO 9157404) is a Bangladesh-flagged container ship. As of Nov 14, 2026, 05:16 UTC: under way from Chittagong to Colombo; reported ETA Nov 18, 06:00 port local time.
Vessel Details
Vessel type
Container Ship
Detailed type
Container Ship
Flag
BD
Year built
1997
TEU capacity
1,550 TEU
Length overall (LOA)
184.5 m
Beam
27.6 m
Max draught
8.4 m
Gross tonnage
16,772 GT
Deadweight tonnage
24,636 DWT
Average speed
5.1 kn
Maximum speed
16 kn
Call sign
S2BE9
AIS Position
As of Nov 14, 2026, 19:52 UTC.
Last reported at 20.0°N, 91.0°E.
Position last updated Nov 13, 2026, 20:01 UTC.
Last reported navigation status: Under way using engine. MMSI 405000291.
Voyage CHITTAGONG (BDCGP) to COLOMBO (LKCMB), reported ETA Nov 18, 2026, 06:00 port local time.
A note from Julia at Skypace
Do you ship between the US and Sri Lanka or Bangladesh? Let's meet: I'd be glad to see how Skypace can help on your lanes. My next opening is Monday, Nov 16 at 10:00 AM PT. Book it or pick another time here.
Scheduled Sailings for HR SARERA
As of Nov 14, 2026, 19:52 UTC.
port local time
Colombo (LKCMB) to Chattogram (BDCGP) · ETD Jan 12, 2027, ETA Jan 16, 2027, 4 days transit · Evergreen · Voy. 0156N · Sourcing in-progress
Colombo (LKCMB) to Chattogram (BDCGP) · ETD Feb 9, 2027, ETA Feb 13, 2027, 4 days transit · Evergreen · Voy. 0158N · Sourcing in-progress
Related Voyages
As of Nov 14, 2026, 19:52 UTC.
port local time
Evergreen, Voy. 0156N: New York (USNYC) to Chattogram (BDCGP) via Kaohsiung (TWKHH) and Colombo (LKCMB). HR SARERA sails the Colombo (LKCMB) to Chattogram (BDCGP) leg. Departs Nov 2, 2026, arrives Jan 16, 2027. From $2,480 / 20′
Evergreen, Voy. 0156N: Norfolk (USORF) to Chattogram (BDCGP) via Kaohsiung (TWKHH) and Colombo (LKCMB). HR SARERA sails the Colombo (LKCMB) to Chattogram (BDCGP) leg. Departs Nov 4, 2026, arrives Jan 16, 2027. From $2,480 / 20′
Evergreen, Voy. 0158N: New York (USNYC) to Chattogram (BDCGP) via Kaohsiung (TWKHH) and Colombo (LKCMB). HR SARERA sails the Colombo (LKCMB) to Chattogram (BDCGP) leg. Departs Dec 2, 2026, arrives Feb 13, 2027. From $2,480 / 20′
Port Call History
As of Nov 14, 2026, 19:52 UTC.
port local time
CHITTAGONG (BDCGP), BD: departed Nov 13, 2026, 12:38.